What We Do

Services

Every job we quote falls into one of these.

Home › Services

Everything we take on

Every job below is one we do ourselves across Santee.

Deck Installation

We frame and build new decks in wood or composite, sized and laid out for how you use the yard, not a stock plan. Footings go below grade to current code and joists run at 16 inches on center for a deck that won't bounce when you've got a crowd on it.

Deck Repair

Cupped boards, popped screws, soft spots near the house and railings that move are the calls we get most. We open up the framing to find the actual failure instead of just swapping the board that looks bad.

Deck Staining & Sealing

Wood decking in Santee takes a beating from UV even with our low humidity, and an unsealed deck will gray and start splitting within a couple seasons. We pressure wash, sand where needed, and apply a penetrating stain or sealer rated for the sun exposure your deck actually gets.

Custom Deck Design

Multi-level decks, built-in seating, stairs down a slope, pergola framing over part of the deck, we lay it out before any lumber gets ordered. We'll tell you if a design idea is going to fight the structure underneath it.

Composite Decking

Trex, TimberTech and similar boards need hidden fastener systems and expansion gaps that wood decking doesn't, and installing them like wood is how you get buckled boards two summers in. We install to the manufacturer's spec for your specific board and this climate.

Deck Railing Installation

Wood, composite, cable and glass panel railing, set to the height and baluster spacing current code requires. A lot of older decks we work on have railing that's out of code by an inch or two, and we flag that even on jobs where we're not touching the railing.

Deck Resurfacing

If the framing underneath is still sound, we'll pull the old decking and install new boards over it instead of rebuilding the whole structure. It's a faster, cheaper way to get a deck that looks new without tearing out footings and joists that still have life in them.

Multi-Level Deck Construction

Sloped Santee lots often call for a deck that steps down in two or three levels instead of one flat platform. Each level needs its own beam and footing calculations, and the stairs between them get built on site to match the actual rise, not a stock stringer.

Deck Demolition & Removal

Old deck coming out before a new one goes in, or just coming out. We haul the lumber, pull the fasteners out of the house framing, and check the ledger area for rot before anything new gets attached there.

Pergolas & Deck Covers

A pergola or shade structure built onto or next to your deck, framed to carry the load and flashed where it meets the house. Worth planning at the same time as the deck if you know you want shade, since the footings can share the layout.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Santee, CA

These are the communities where we build and repair decks most often.

Santee, CA
San Diego, CA
Chula Vista, CA
Oceanside, CA
Escondido, CA
El Cajon, CA
Carlsbad, CA
San Marcos, CA
Vista, CA
La Mesa, CA
Poway, CA
Lakeside, CA
Common Questions

Things worth asking

Questions that come up once a project is underway.

Do I need a permit for a new deck?
Most jurisdictions in San Diego County require a permit for any deck more than 30 inches above grade, and some require one regardless of height if it's attached to the house. Permit pulling and inspection scheduling are part of standard deck installation.
How long does building a deck take?
A straightforward ground-level deck usually takes one to two weeks from footings to final board, weather and permit timing aside. A multi-level deck with stairs and custom railing can run three to four weeks.
Can deck work be done within a set budget?
Decking material is usually the biggest lever on cost, since pressure-treated pine costs less than cedar, which costs less than composite boards like Trex. Square footage and railing style are the other two variables typically adjusted to hit a target number.
Is there a guarantee on deck construction?
Workmanship is commonly backed for a set period after completion, and materials carry whatever warranty the manufacturer offers, which varies by composite brand and wood species. Specific terms should be written into the quote, not left as a verbal promise.
Who do I deal with day to day during a deck build?
On a well-run deck job, the same crew that frames the structure also finishes the decking and railing, with one person acting as the point of contact for questions. Subcontractors are typically not brought in to handle separate pieces of a deck build.
What decking materials are available?
Pressure-treated pine, cedar, redwood and composite boards from brands like Trex and TimberTech are all standard decking options. Each has a different fastening method and maintenance schedule, which should be explained at the quote stage.
Can I still use my yard while the deck is being built?
Partial yard access is usually possible during deck construction, though the immediate work area needs to stay clear for safety, especially once a power saw or nail gun is in use. Full yard access returns once decking and railing are in place.
What do I need to do to prepare before deck work starts?
Clearing furniture, planters and anything breakable away from the work area is the main preparation needed from a homeowner. Clear access for a truck to drop lumber close to the build site also speeds the job along.
What happens if rot or damage is found once the old deck comes off?
Hidden rot at the ledger board or rim joist shows up more often than homeowners expect once old decking is pulled, and a reputable deck contractor flags it with photos and a revised quote before further work happens. It should never be added to the bill without a conversation first.
How do I maintain a new deck once it's finished?
Wood decking typically needs restaining every two to three years in a sunny climate like San Diego County, sooner if it faces south with no shade. Composite decking needs less upkeep, mainly periodic washing to keep mildew and pollen from building up in the grain texture.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (619) 626-1869